x
A S L
  • Mon-Fri 08:00AM-05:00PM
  • Andy Surveys Company Nigeria Ltd
  • Check Email

Projects

COMPREHENSIVE LIST OF SOME COMPLETED PROJECTS.

S/NO

PROJECT TITLE

YEAR

LOCATION

CLIENT

PROJECT STATUS

1

Post IP-Reported Defects Verification Of 10" Oben - Amukpe & 8" Oben Fs - Oben

January, 2022

Oben/Amukpe

BEN-SEGBA/SEPLAT

SACTISFACTORY

2

As-Built Survey of Ogegere GGGM Location

January, 2022

Jese

SEPLAT

SACTISFACTORY

3

FP Survey of Rapele Lact Unit Proposed Land

November, 2021

Ugbokodo

SEPLAT

SACTISFACTORY

4

Barthymetry Survey of Mayuku Creek and Re-opening of Ovhor DKFW Slot

August, 2021

Ovhor

SEPLAT

SACTISFACTORY

5

As-Built Survey of Oben 5 & Oben 32

June, 2021

Oben

SEPLAT

SACTISFACTORY

6

Route Survey of Elume Okegborede Okuovo Community Road

March, 2021

Elume

SEPLAT

SACTISFACTORY

7

Boundary Re-Opening of Amukpe-Oben ROW Survey

December, 2020

Amukpe

SEPLAT

SACTISFACTORY

8

Amended Sapele LPG Access Road

August, 2020

SAPELE

SEPLAT

SACTISFACTORY

9

Civil Construction for Obele Export Pump Header

August 2020

Obele

Ben-Segba

SACTISFACTORY

10

Full Preparation Survey

 Of Amended Sapele LPG additional Acquisition Area

JULY, 2020

SAPELE

SEPLAT

SACTISFACTORY

11

Construction of Imo River Well 28L/S Flow line - 4” x 5.2km

April 2020

Imo River

Ben-Segba

SACTISFACTORY

12

Full Preparation Survey

 Of Sapele FOD Flow Line ROW Acquisition

MARCH 2020

SAPELE

SEPLAT

SACTISFACTORY

13

Full Preparation Survey

 Of Ovhor CYFW-02 And CXFV Location

FEBRUARY 2020

OVHOR

SEPLAT

SACTISFACTORY

14

As-Built And Bathymetric Survey Of Ovhor DDFV Location

DECEMBER 2019

OVHOR

SEPLAT

SACTISFACTORY

15

Full Preparation Survey Of Ovhor DNFT-01 Additional Land And Ovhor DMFU Location

OCTOBER 2019

OVHOR

SEPLAT

SACTISFACTORY

16

Igueleba-Oben road expansion route survey

AUGUST 2019

OBEN

SEPLAT

SACTISFACTORY

17

Topographic and detail survey of Mosogar wooden bridge portion of Oben-Amukpe ROW

AUGUST 2019

MOSOGAR

SEPLAT

SACTISFACTORY

18

Full preparatory survey Sapele well 10 and boundary re-opening

JULY 2019

SAPELE

SEPLAT

SACTISFACTORY

19

Full preparatory survey of Sapele LPG location and alternative route to Ogorode

JULY 2019

SAPELE

SEPLAT

SACTISFACTORY

20

As-built survey of Obele well 3L and 5T flow lines replacement

JUN 2019

OBELLE

SPDC/Ben-Segba Technical Services Ltd

SACTISFACTORY

21

Ugbevwe community road construction route survey

MAY 2019

UGBEVWE

SEPLAT

SACTISFACTORY

22

Boundary re-opening, detailing and bathymetric survey of Ovhor manifold

MAY 2019

OVHOR

SEPLAT

SACTISFACTORY

23

Boundary re-opening and bathymetric survey of Ovhor well 06

MAY 2019

OVHOR

SEPLAT

SACTISFACTORY

24

Maintenance Dredging of Ugbokodo Jetty Slots

April 2019

Ugbokodo

Ben-Segba

SACTISFACTORY

25

Dredging Activities in Robertkiri

2018

ROBERTKIRI

Presylyn Ltd/Belemaoil Ltd

SUSPENDED

26

Flow line Construction of 4” x 15km Test Line

June 2018

Mini Nta

Ben-Segba

SACTISFACTORY

27

Sounding, Detailing, Design & Piling For The Construction Of One Buoy Mooring Dolphin, Two Breast mooring Dolphins & Two Breast Dolphins

MAR-2017

WRPC, WARRI

HENSTEEL/SEPLAT

SACTISFACTORY

28

Sounding, Detailing, Design & Piling For The Construction Of One Buoy Mooring Dolphin, Two Breast mooring Dolphins & Two Breast Dolphins

FEB-2017

WRPC, WARRI

DORIG/SEPLAT

SATISFACTORY

29

As-Built Survey of Obigbo North condensate line

MAR-2016

OBIGBO

BEN-SEGBA/SPDC

SATISFACTORY

30

As-Built Survey of Orogho Well 7 Flow Line

JUL-2015

OROGHO

BEN-SEGBA/SEPLAT

SATISFACTORY

31

As-Built Survey of Otumara  Well 13, 20, 29 & 58 FL Replacement

SEPT-2014

OTUMARA

BEN-SEGBA/SPDC

SATISFACTORY

32

As-Built Survey of Obigbo Well 38 & 52 FL Replacement

SEPT-2014

OTUMARA

BEN-SEGBA/SPDC

SATISFACTORY

33

As-Built Survey of Escravos-Lagos NNPC Pipeline

JAN-2014

ORE

BEN-SEGBA/ZAKEM

SATISFACTORY

34

16” Egbema-Assa Pipeline Defect Survey

APR 2014

EGBEMA

Kemud Int Ltd

SATISFACTORY

35

Setting out of Marine university, Okerekoko

MAR 2014

OKEREKOKO

Meguro

SATISFACTORY

36

Bathymetric Survey of Gramen Jetty

OCT 2013

EKPAN

Gramen Petroserve

SATISFACTORY

37

8” Belema-Sego IP Defect identification survey

SEP 2013

BELEMA

Kemu/SPDC

SATISFACTORY

38

Chemical Injection Skid Pilling (PWD)

AUG 2013

ESCRAVOS

PIVOT/Chevron

SATISFACTORY

39

As-built Survey of Obigbo 50T & 52T Flow Line

AUG 2013

OYIGBO

BEN-SEGBA / SPDC

SATISFACTORY

40

As-built Survey of Obigbo 54T Gas Line

JUL 2013

OYIGBO

BEN-SEGBA / SPDC

SATISFACTORY

41

6” Ovhor Manifold to Sapele FS Bulk Line As-Built Survey

DEC. 2012

SAPELE

Ben-Segba/

Seplat

SATISFACTORY

42

Chemical Injection Skid Pilling Phase 1

SEP 2012

ESCRAVOS

Gramen/Chevron

SATISFACTORY

43

Boundary Re-Opening and As-built survey of Seibou - Opukushi Pipeline

SEP 2012

OPUKUSHI

BEN-SEGBA / SPDC

SATISFACTORY

44

8” Umuechem-Nkpoku DL Defect Repairs

JUN 2012

UMUECHEM

SPDC/SeaGold Ltd/Kemud Ltd.

SATISFACTORY

45

12” Oguta-Egbema DL Defect Repair Survey

MAY 2012

EGBEMA

SPDC/Anasami Int Ltd/Cloder Nig. Ltd

SATISFACTORY

46

Liberty Close Road Rehabilitation Survey

MAY 2012

PORT HARCOURT

NDDC

SATISFACTORY

47

Cable/Pipe tracing of Port Harcourt-IA Helicopter Hanger Substructure Apron Link to Existing Apron

APR 2012

PORT HARCOURT

Glatrico International Ltd/SPDC

SATISFACTORY

48

Escravos Beach, Wells 6s & 13s ROW re-opening

FEB. 2012

ESCRAVOS BEACH

BEN-SEGBA / SPDC

SATISFACTORY

49

Okpare well 24 Flow line construction

DEC. 2011

OKPARE - OLOMU

BEN-SEGBA / SPDC

SATISFACTORY

50

12” PMS Pipe detecting, Tracing and Detailing

JAN 2012

APAPA, LAGOS

REJIROMA / EXXONMOBIL

SATISFACTORY

51

Monitoring of various stockpile/volume calculations

DEC 2011

GBEREGOLO/ESANMA

DELCON/

SETRACO

SATISFACTORY

52

Mapping/Town planning of Emu - Ebendo

SEPT

2011

EMU – EBENDO

EMU – EBENDO COMMUNITY

SATISFACTORY

53

Pipe Detecting of Oben-Amukpe 10” Trunkline’s ROW

JUN

2011

OBEN-AMUKPE

SEPLAT/BEN-SEGBA

SATISFACTORY

54

Leak repairs on 24” Trunkline

MAR 2011

EJEKIMONI

SEPLAT/BEN-SEGBA

SATISFACTORY

55

ROW re-opening, pillaring and coordination, Setting out of F/line route/as-built survey

FEB. 2010

KAMBO/TUNU

SPDC/DELCON

SATISFACTORY

56

Egwa/Odidi pre-dredge sounding of all well slots (75 slots) at Egwa/Odidi Fields

JAN. 2010

EGWA/ODIDI

SPDC/DELCON

SATISFACTORY

57

GPS Monumentation and Co-ordination, ROW re-opening, pillaring and coordination

NOV. 2009

OKPUKUSHI

SPDC/DELCON

SATISFACTORY

58

Disabling and encapsulating of illegal bunkering points

JUN 2009

DIBI FIELD

CNL/ BABLINK

SATISFACTORY

59

Damage Assessments from RMP17 to RMP6 and 9

SEP 2009

OLERO CREEK

CNL/ BABLINK

SATISFACTORY

60

Setting-out of Yard/Fence limit

MAY 2009

NIGERIAN PORTS AUTHORITY (NPA) WARRI

CNL/BABLINK

SATISFACTORY

61

Abigborodo Well-1 Damage

assessment

APR 2005

ABIGBORODO

SAPELE-

WEST

CNL/DEWAYLES

SATISFACTORY

62

Makaraba Crude/Gas Line (Vandal) replacement.

MAY 2005

MACARABA

CLN/GRAMEN

SATISFACTORY

63

GPS Monumentation and Co-ordination Abigborodo Well- 1Pipline Route Survey

JAN 2OO4

ABIGBORODO SAPELE- WEST

CNL/BAYWOOD

SATISFACTORY

64

Survey Services of FYIP PROJECT (ONSHORE PIPELINE) from NORTH BANK, YOKRI & SOUTH BANK FLOWSTATIONS to various CLUSTERS.

SEP 2003

YOKRI

SUFFOLK/DELCON

SATISFACTORY

65

As-Built Survey Services of Wells 3, 5, 6 & 7 FLOWLINES CONSTRUCTION AT OVHOR

SEP 2003-JUL 2004

SAPELE-WEST

SPDC/BAYWOOD

SATISFACTORY

66

As-Built Survey Services of BROWN FIELD PROJECTS IN BATAN, ODIDI & EGWA FIELDS

NOV 2001-0MAR 2002

BATAN/ODIDI/

EGWA

SPDC/DAEWOO

SATISFACTORY

67

As-Built Survey Services of WELLS 29T and 50T FLOWLINES CONSTRUCTION AT ODIDI FIELD

SEP 2001-DEC 2001

ODIDI

SPDC/BAYWOOD

SATISFACTORY

68

As-Built Survey Services of WELLS 07, 09, 15, 17, 22, 27, 29, 31, 32, 34, 37,43, 28, 30, 39, 48, 49, 32, 19, 51, 52, 46, and Well 26 GAS/FLOWLINES REPL. in OTUMARA FIELD.

FEB 2001-APR

2002

OTUMARA

SPDC/GREDOR

SATISFACTORY

69

Survey Services at SAPELE-WEST FLOW STATION AREA (SAPELE-WEST FIELD)

DEC 2000

SAPELE WEST

SPDC/BAYWOOD

SATISFACTORY

70

As-Built Survey Services of WELLS 2T and 4T FLOW LINES CONSTRUCTION AT UBEFAN (ODIDI FIELD)

JUL 2000

ODIDI

SPDC/BAYWOOD

SATISFACTORY

71

As-Built Survey Services of WELLS 18T, 51T, 48T, 49T, 31L/S & 35L/S, FLOW LINES RE-ROUTING CONSTRUCTION (ODIDI FIELD)

JUN 2001

ODIDI

SPDC/BAYWOOD

SATISFACTORY

72

As-Built Survey Services of VARIOUS WELLS FLOW LINES REPLACEMENT/ CONSTRUCTION IN OTUMARA FIELD

APR 2001

OTUMARA

SPDC/DELCON

SATISFACTORY

73

As-Built Survey Services of AGG PIPE LINE NETWORK PROJECT AT BATAN, ODIDI & EGWA FIELDS

JUN 2001

BATAN

ODIDI

EGWA

SPDC/DAEWOO

SATISFACTORY

74

As-Built Survey Services of WELLS 1, 3, & 11 TO FLOW STATION 9

 (EGWA-1 FIELD)

JUL 2000

EGWA-1

SPDC/DELCON

SATISFACTORY

75

As-Built Survey Services of WELL32 TO TIE-POINT & WELL 33 TO FLOWSTATION (EGWA-11 FIELD)

JUL 2000

EGWA-11

SPDC/DELCON

SATISFACTORY

76

As-Built Survey Services of WELL 5T, 17T 7 39 SERIAL FLOWLIINE REPLACEMENT (ODIDI-1 FIELD)

SEP 1999

ODIDO-1

SPDC/DAEWOO

SATISFACTORY

78

As-Built/Survey Services of YOKRI BULKINES (MANIFOLD 9 TO NORTH BANK)

AUG 1999

YOKRI

SPDC/DELCON

SATISFACTORY

79

As-Built Survey Services of ODIDI I FLOW STATION FLOW LINE RE-ROUTING CONSTRUCTION  (ODID-11 FIELD)

AUG 1999

ODIDI-11

SPDC/DAEWOO

SATISFACTORY

80

As-Built Survey Services of WELL34 LIMA/SERIAL & WELL 35 LIMA/SERIAL FLOWLINES REPLACEMENT (ODIDI-11 FIELD)

AUG 1999

ODIDI-11

SPDC/DAEWOO

SATISFACTORY

81

As-Built Survey Services of WELL 20 LIMA/SERIAL FLOW LINE AND GAS LINE REPLACEMENT

 (EGWA-11 FIELD)

JUN 1999

EGWA-11

SPDC/DELCON

SATISFACTORY

82

As-Built Survey Services of YOKRI BULK LINES REPLACEMENT MANIFOLD 1 TO NORTH-BANK FLOW STATION  (FORCADOS NORTH BANK FIELD)

APR 1999

FORCADOS

NORTH-BANK

SPDC/DELCON

SATISFACTORY

83

As-Built Survey Services of WELL 78T TO MANIFOLD 7, WELL 79T TO MANIFOLD 5, WELL 85T TO MANIFOLD 6, MANIFOLD 8 TO MANIFOLD 9 (LINE 4)

APR 1999

FORCADOS

YOKRI

SPDC/DELCON

SATISFACTORY

84

As-Built Survey Services of WELLS 19 & 24 GAS LINES REPLACEMENT (EGWA FIELD)

APR 1999

EGWA

SPDC/DAEWOO

SATISFACTORY

85

As-Built Survey Services of WELL 4 LIMA FLOW LINE REPLACEMENT  (EGWA FIELD)

APR 1999

      EGWA

    SPDC/DAEWOO

SATISFACTORY

86

As-Built Survey Services of WELL 4T FLOW LINE CONSTRUCTION (BATAN FIELD)

MAR 1999

BATAN

SPDC/DAEWOO

SATISFACTORY

87

As-Built Survey Services of WELL 13T (AHBR-1) FLOW LINE CONSTRUCTION (BATAN FIELD)

MAR 1999

BATAN

 

 

SPDC/DAEWOO

SATISFACTORY

87

As-Built Survey Services of WELL 12T (AJBR-2) FLOW LINE CONSTRUCTION (BATAN FIELD)

SEP 1998

BATAN

 

SPDC/DAEWOO

SATISFACTORY

88

As-Built Survey Services of WELL 50T FLOW LINE REPLACEMENT/RE-ROUTING TO ODIDI 1 FLOW STATION (ODIDI-1 FIELD)

MAR 1998

ODIDI-1

SPDC/DAEWOO

SATISFACTORY

89

As-Built Survey Services of BATAN/AJUJU PROJECT CONSTRUCTION

DEC 1997-JUN 1998

BATAN/AJUJU

SPDC/DAEWOO

SATISFACTORY

90

As-Built Survey Services of DIBI PROJECTS (SFS) CONSTRUCTION

MAR 1998-JUN 1998

BENIN-RIVER

CNL/DAEWOO

SATISFACTORY

91

As-Built Survey Services of BATAN FLOW LINES CONSTRUCTION

MAR 1998-APR 1998

BATAN

SPDC/DAEWOO

SATISFACTORY

92

As-Built Survey Services of FLOW LINES (52) RE-ROUTING AT ODIDI-1 FLOWSTATION

MAY 1998-AUG 1999

ODIDI-1

SPDC/DAEWOO

    SATISFACTORY

93

P1 And FP Survey of OJOBO SAND-FILL AREA (Topographic & Hydrographic Analysis)

NOV 1997-FEB 1998

OJOBO

SPDC/ZENITH

    SATISFACTORY

94

As-Built Survey Services of AJUJU FLOW LINES CONSTRUCTION

DEC 1997-FEB 1998

  

AJUJU                                

 

SPDC/DAEWOO

 

SATISFACTORY

95

As-Built Survey Services of OLERO CREEK (NFS&QUS) CONSTRUCTION

OCT 1997- APR 1998

OLERO CREEK

CNL/DAEWOO

SATISFACTORY

96

As-Built Survey Services of SAND PAD ONSTRUCTION/CONCRETE BARGE INSTALLATION, VENT, EMERGENCY RELEIF, FLARE LINES, TRANSLATIONAL RESTRAINING AND BUMPER PILES.

OCT 1997- APR 1998

BENIN -RIVER & DIBI

CNL/DAEWOO

SATISFACTORY

97

As-Built Survey Services of TUNU EPF PROJECTS

 

OCT 1996-NOV 1996

TUNU

SPDC/DAEWOO

SATISFACTORY

98

Spot Levelling And Mapping Survey Of Parcel (A) Contract of the PROPOSED AIRPORT, OSUBI, WARRI

FEB 1996

WARRI

SPDC/ESJAY

SATISFACTORY

99

As-Built Survey Services of ABITEYE FLOW LINES CONSTRUCTION

JUN 1996-OCT 1996

ABITEYE

CNL/DAEWOO

 

100

As-Built Survey Services of MAKARABA FLOW LINE CONSTRUCTION

MAR 1996-MAY 1996

MAKARABA

CNL/DAEWOO

SATISFACTORY

101

As-Built Survey Services of BENIN- RIVER FLOW STATION CONSTRUCTION

NOV 1995-MAR 1996

OLERO CREEK

CNL/DAEWOO

 

SATISFACTORY

 

102

As-Built Survey Services of Sand Pad, Vent, Emergency Relief, Flare Lines, Translational Restraining And Bumper Piles

OCT 1995/96

OLERO CREEK

CNL/DAEWOO

SATISFACTORY

103

Investigation Survey Of Abraka-Ashaka Road

JUNE 1994

ABRAKA

OMPADEC (NDDC)

SATISFACTORY

 

Go To Top
X