COMPREHENSIVE LIST OF SOME COMPLETED PROJECTS.
S/NO |
PROJECT TITLE |
YEAR |
LOCATION |
CLIENT |
PROJECT STATUS |
1 |
Post IP-Reported Defects Verification Of 10" Oben - Amukpe & 8" Oben Fs - Oben |
January, 2022 |
Oben/Amukpe |
BEN-SEGBA/SEPLAT |
SACTISFACTORY |
2 |
As-Built Survey of Ogegere GGGM Location |
January, 2022 |
Jese |
SEPLAT |
SACTISFACTORY |
3 |
FP Survey of Rapele Lact Unit Proposed Land |
November, 2021 |
Ugbokodo |
SEPLAT |
SACTISFACTORY |
4 |
Barthymetry Survey of Mayuku Creek and Re-opening of Ovhor DKFW Slot |
August, 2021 |
Ovhor |
SEPLAT |
SACTISFACTORY |
5 |
As-Built Survey of Oben 5 & Oben 32 |
June, 2021 |
Oben |
SEPLAT |
SACTISFACTORY |
6 |
Route Survey of Elume Okegborede Okuovo Community Road |
March, 2021 |
Elume |
SEPLAT |
SACTISFACTORY |
7 |
Boundary Re-Opening of Amukpe-Oben ROW Survey |
December, 2020 |
Amukpe |
SEPLAT |
SACTISFACTORY |
8 |
Amended Sapele LPG Access Road |
August, 2020 |
SAPELE |
SEPLAT |
SACTISFACTORY |
9 |
Civil Construction for Obele Export Pump Header |
August 2020 |
Obele |
Ben-Segba |
SACTISFACTORY |
10 |
Full Preparation Survey Of Amended Sapele LPG additional Acquisition Area |
JULY, 2020 |
SAPELE |
SEPLAT |
SACTISFACTORY |
11 |
Construction of Imo River Well 28L/S Flow line - 4” x 5.2km |
April 2020 |
Imo River |
Ben-Segba |
SACTISFACTORY |
12 |
Full Preparation Survey Of Sapele FOD Flow Line ROW Acquisition |
MARCH 2020 |
SAPELE |
SEPLAT |
SACTISFACTORY |
13 |
Full Preparation Survey Of Ovhor CYFW-02 And CXFV Location |
FEBRUARY 2020 |
OVHOR |
SEPLAT |
SACTISFACTORY |
14 |
As-Built And Bathymetric Survey Of Ovhor DDFV Location |
DECEMBER 2019 |
OVHOR |
SEPLAT |
SACTISFACTORY |
15 |
Full Preparation Survey Of Ovhor DNFT-01 Additional Land And Ovhor DMFU Location |
OCTOBER 2019 |
OVHOR |
SEPLAT |
SACTISFACTORY |
16 |
Igueleba-Oben road expansion route survey |
AUGUST 2019 |
OBEN |
SEPLAT |
SACTISFACTORY |
17 |
Topographic and detail survey of Mosogar wooden bridge portion of Oben-Amukpe ROW |
AUGUST 2019 |
MOSOGAR |
SEPLAT |
SACTISFACTORY |
18 |
Full preparatory survey Sapele well 10 and boundary re-opening |
JULY 2019 |
SAPELE |
SEPLAT |
SACTISFACTORY |
19 |
Full preparatory survey of Sapele LPG location and alternative route to Ogorode |
JULY 2019 |
SAPELE |
SEPLAT |
SACTISFACTORY |
20 |
As-built survey of Obele well 3L and 5T flow lines replacement |
JUN 2019 |
OBELLE |
SPDC/Ben-Segba Technical Services Ltd |
SACTISFACTORY |
21 |
Ugbevwe community road construction route survey |
MAY 2019 |
UGBEVWE |
SEPLAT |
SACTISFACTORY |
22 |
Boundary re-opening, detailing and bathymetric survey of Ovhor manifold |
MAY 2019 |
OVHOR |
SEPLAT |
SACTISFACTORY |
23 |
Boundary re-opening and bathymetric survey of Ovhor well 06 |
MAY 2019 |
OVHOR |
SEPLAT |
SACTISFACTORY |
24 |
Maintenance Dredging of Ugbokodo Jetty Slots |
April 2019 |
Ugbokodo |
Ben-Segba |
SACTISFACTORY |
25 |
Dredging Activities in Robertkiri |
2018 |
ROBERTKIRI |
Presylyn Ltd/Belemaoil Ltd |
SUSPENDED |
26 |
Flow line Construction of 4” x 15km Test Line |
June 2018 |
Mini Nta |
Ben-Segba |
SACTISFACTORY |
27 |
Sounding, Detailing, Design & Piling For The Construction Of One Buoy Mooring Dolphin, Two Breast mooring Dolphins & Two Breast Dolphins |
MAR-2017 |
WRPC, WARRI |
HENSTEEL/SEPLAT |
SACTISFACTORY |
28 |
Sounding, Detailing, Design & Piling For The Construction Of One Buoy Mooring Dolphin, Two Breast mooring Dolphins & Two Breast Dolphins |
FEB-2017 |
WRPC, WARRI |
DORIG/SEPLAT |
SATISFACTORY |
29 |
As-Built Survey of Obigbo North condensate line |
MAR-2016 |
OBIGBO |
BEN-SEGBA/SPDC |
SATISFACTORY |
30 |
As-Built Survey of Orogho Well 7 Flow Line |
JUL-2015 |
OROGHO |
BEN-SEGBA/SEPLAT |
SATISFACTORY |
31 |
As-Built Survey of Otumara Well 13, 20, 29 & 58 FL Replacement |
SEPT-2014 |
OTUMARA |
BEN-SEGBA/SPDC |
SATISFACTORY |
32 |
As-Built Survey of Obigbo Well 38 & 52 FL Replacement |
SEPT-2014 |
OTUMARA |
BEN-SEGBA/SPDC |
SATISFACTORY |
33 |
As-Built Survey of Escravos-Lagos NNPC Pipeline |
JAN-2014 |
ORE |
BEN-SEGBA/ZAKEM |
SATISFACTORY |
34 |
16” Egbema-Assa Pipeline Defect Survey |
APR 2014 |
EGBEMA |
Kemud Int Ltd |
SATISFACTORY |
35 |
Setting out of Marine university, Okerekoko |
MAR 2014 |
OKEREKOKO |
Meguro |
SATISFACTORY |
36 |
Bathymetric Survey of Gramen Jetty |
OCT 2013 |
EKPAN |
Gramen Petroserve |
SATISFACTORY |
37 |
8” Belema-Sego IP Defect identification survey |
SEP 2013 |
BELEMA |
Kemu/SPDC |
SATISFACTORY |
38 |
Chemical Injection Skid Pilling (PWD) |
AUG 2013 |
ESCRAVOS |
PIVOT/Chevron |
SATISFACTORY |
39 |
As-built Survey of Obigbo 50T & 52T Flow Line |
AUG 2013 |
OYIGBO |
BEN-SEGBA / SPDC |
SATISFACTORY |
40 |
As-built Survey of Obigbo 54T Gas Line |
JUL 2013 |
OYIGBO |
BEN-SEGBA / SPDC |
SATISFACTORY |
41 |
6” Ovhor Manifold to Sapele FS Bulk Line As-Built Survey |
DEC. 2012 |
SAPELE |
Ben-Segba/ Seplat |
SATISFACTORY |
42 |
Chemical Injection Skid Pilling Phase 1 |
SEP 2012 |
ESCRAVOS |
Gramen/Chevron |
SATISFACTORY |
43 |
Boundary Re-Opening and As-built survey of Seibou - Opukushi Pipeline |
SEP 2012 |
OPUKUSHI |
BEN-SEGBA / SPDC |
SATISFACTORY |
44 |
8” Umuechem-Nkpoku DL Defect Repairs |
JUN 2012 |
UMUECHEM |
SPDC/SeaGold Ltd/Kemud Ltd. |
SATISFACTORY |
45 |
12” Oguta-Egbema DL Defect Repair Survey |
MAY 2012 |
EGBEMA |
SPDC/Anasami Int Ltd/Cloder Nig. Ltd |
SATISFACTORY |
46 |
Liberty Close Road Rehabilitation Survey |
MAY 2012 |
PORT HARCOURT |
NDDC |
SATISFACTORY |
47 |
Cable/Pipe tracing of Port Harcourt-IA Helicopter Hanger Substructure Apron Link to Existing Apron |
APR 2012 |
PORT HARCOURT |
Glatrico International Ltd/SPDC |
SATISFACTORY |
48 |
Escravos Beach, Wells 6s & 13s ROW re-opening |
FEB. 2012 |
ESCRAVOS BEACH |
BEN-SEGBA / SPDC |
SATISFACTORY |
49 |
Okpare well 24 Flow line construction |
DEC. 2011 |
OKPARE - OLOMU |
BEN-SEGBA / SPDC |
SATISFACTORY |
50 |
12” PMS Pipe detecting, Tracing and Detailing |
JAN 2012 |
APAPA, LAGOS |
REJIROMA / EXXONMOBIL |
SATISFACTORY |
51 |
Monitoring of various stockpile/volume calculations |
DEC 2011 |
GBEREGOLO/ESANMA |
DELCON/ SETRACO |
SATISFACTORY |
52 |
Mapping/Town planning of Emu - Ebendo |
SEPT 2011 |
EMU – EBENDO |
EMU – EBENDO COMMUNITY |
SATISFACTORY |
53 |
Pipe Detecting of Oben-Amukpe 10” Trunkline’s ROW |
JUN 2011 |
OBEN-AMUKPE |
SEPLAT/BEN-SEGBA |
SATISFACTORY |
54 |
Leak repairs on 24” Trunkline |
MAR 2011 |
EJEKIMONI |
SEPLAT/BEN-SEGBA |
SATISFACTORY |
55 |
ROW re-opening, pillaring and coordination, Setting out of F/line route/as-built survey |
FEB. 2010 |
KAMBO/TUNU |
SPDC/DELCON |
SATISFACTORY |
56 |
Egwa/Odidi pre-dredge sounding of all well slots (75 slots) at Egwa/Odidi Fields |
JAN. 2010 |
EGWA/ODIDI |
SPDC/DELCON |
SATISFACTORY |
57 |
GPS Monumentation and Co-ordination, ROW re-opening, pillaring and coordination |
NOV. 2009 |
OKPUKUSHI |
SPDC/DELCON |
SATISFACTORY |
58 |
Disabling and encapsulating of illegal bunkering points |
JUN 2009 |
DIBI FIELD |
CNL/ BABLINK |
SATISFACTORY |
59 |
Damage Assessments from RMP17 to RMP6 and 9 |
SEP 2009 |
OLERO CREEK |
CNL/ BABLINK |
SATISFACTORY |
60 |
Setting-out of Yard/Fence limit |
MAY 2009 |
NIGERIAN PORTS AUTHORITY (NPA) WARRI |
CNL/BABLINK |
SATISFACTORY |
61 |
Abigborodo Well-1 Damage assessment |
APR 2005 |
ABIGBORODO SAPELE- WEST |
CNL/DEWAYLES |
SATISFACTORY |
62 |
Makaraba Crude/Gas Line (Vandal) replacement. |
MAY 2005 |
MACARABA |
CLN/GRAMEN |
SATISFACTORY |
63 |
GPS Monumentation and Co-ordination Abigborodo Well- 1Pipline Route Survey |
JAN 2OO4 |
ABIGBORODO SAPELE- WEST |
CNL/BAYWOOD |
SATISFACTORY |
64 |
Survey Services of FYIP PROJECT (ONSHORE PIPELINE) from NORTH BANK, YOKRI & SOUTH BANK FLOWSTATIONS to various CLUSTERS. |
SEP 2003 |
YOKRI |
SUFFOLK/DELCON |
SATISFACTORY |
65 |
As-Built Survey Services of Wells 3, 5, 6 & 7 FLOWLINES CONSTRUCTION AT OVHOR |
SEP 2003-JUL 2004 |
SAPELE-WEST |
SPDC/BAYWOOD |
SATISFACTORY |
66 |
As-Built Survey Services of BROWN FIELD PROJECTS IN BATAN, ODIDI & EGWA FIELDS |
NOV 2001-0MAR 2002 |
BATAN/ODIDI/ EGWA |
SPDC/DAEWOO |
SATISFACTORY |
67 |
As-Built Survey Services of WELLS 29T and 50T FLOWLINES CONSTRUCTION AT ODIDI FIELD |
SEP 2001-DEC 2001 |
ODIDI |
SPDC/BAYWOOD |
SATISFACTORY |
68 |
As-Built Survey Services of WELLS 07, 09, 15, 17, 22, 27, 29, 31, 32, 34, 37,43, 28, 30, 39, 48, 49, 32, 19, 51, 52, 46, and Well 26 GAS/FLOWLINES REPL. in OTUMARA FIELD. |
FEB 2001-APR 2002 |
OTUMARA |
SPDC/GREDOR |
SATISFACTORY |
69 |
Survey Services at SAPELE-WEST FLOW STATION AREA (SAPELE-WEST FIELD) |
DEC 2000 |
SAPELE WEST |
SPDC/BAYWOOD |
SATISFACTORY |
70 |
As-Built Survey Services of WELLS 2T and 4T FLOW LINES CONSTRUCTION AT UBEFAN (ODIDI FIELD) |
JUL 2000 |
ODIDI |
SPDC/BAYWOOD |
SATISFACTORY |
71 |
As-Built Survey Services of WELLS 18T, 51T, 48T, 49T, 31L/S & 35L/S, FLOW LINES RE-ROUTING CONSTRUCTION (ODIDI FIELD) |
JUN 2001 |
ODIDI |
SPDC/BAYWOOD |
SATISFACTORY |
72 |
As-Built Survey Services of VARIOUS WELLS FLOW LINES REPLACEMENT/ CONSTRUCTION IN OTUMARA FIELD |
APR 2001 |
OTUMARA |
SPDC/DELCON |
SATISFACTORY |
73 |
As-Built Survey Services of AGG PIPE LINE NETWORK PROJECT AT BATAN, ODIDI & EGWA FIELDS |
JUN 2001 |
BATAN ODIDI EGWA |
SPDC/DAEWOO |
SATISFACTORY |
74 |
As-Built Survey Services of WELLS 1, 3, & 11 TO FLOW STATION 9 (EGWA-1 FIELD) |
JUL 2000 |
EGWA-1 |
SPDC/DELCON |
SATISFACTORY |
75 |
As-Built Survey Services of WELL32 TO TIE-POINT & WELL 33 TO FLOWSTATION (EGWA-11 FIELD) |
JUL 2000 |
EGWA-11 |
SPDC/DELCON |
SATISFACTORY |
76 |
As-Built Survey Services of WELL 5T, 17T 7 39 SERIAL FLOWLIINE REPLACEMENT (ODIDI-1 FIELD) |
SEP 1999 |
ODIDO-1 |
SPDC/DAEWOO |
SATISFACTORY |
78 |
As-Built/Survey Services of YOKRI BULKINES (MANIFOLD 9 TO NORTH BANK) |
AUG 1999 |
YOKRI |
SPDC/DELCON |
SATISFACTORY |
79 |
As-Built Survey Services of ODIDI I FLOW STATION FLOW LINE RE-ROUTING CONSTRUCTION (ODID-11 FIELD) |
AUG 1999 |
ODIDI-11 |
SPDC/DAEWOO |
SATISFACTORY |
80 |
As-Built Survey Services of WELL34 LIMA/SERIAL & WELL 35 LIMA/SERIAL FLOWLINES REPLACEMENT (ODIDI-11 FIELD) |
AUG 1999 |
ODIDI-11 |
SPDC/DAEWOO |
SATISFACTORY |
81 |
As-Built Survey Services of WELL 20 LIMA/SERIAL FLOW LINE AND GAS LINE REPLACEMENT (EGWA-11 FIELD) |
JUN 1999 |
EGWA-11 |
SPDC/DELCON |
SATISFACTORY |
82 |
As-Built Survey Services of YOKRI BULK LINES REPLACEMENT MANIFOLD 1 TO NORTH-BANK FLOW STATION (FORCADOS NORTH BANK FIELD) |
APR 1999 |
FORCADOS NORTH-BANK |
SPDC/DELCON |
SATISFACTORY |
83 |
As-Built Survey Services of WELL 78T TO MANIFOLD 7, WELL 79T TO MANIFOLD 5, WELL 85T TO MANIFOLD 6, MANIFOLD 8 TO MANIFOLD 9 (LINE 4) |
APR 1999 |
FORCADOS YOKRI |
SPDC/DELCON |
SATISFACTORY |
84 |
As-Built Survey Services of WELLS 19 & 24 GAS LINES REPLACEMENT (EGWA FIELD) |
APR 1999 |
EGWA |
SPDC/DAEWOO |
SATISFACTORY |
85 |
As-Built Survey Services of WELL 4 LIMA FLOW LINE REPLACEMENT (EGWA FIELD) |
APR 1999 |
EGWA |
SPDC/DAEWOO |
SATISFACTORY |
86 |
As-Built Survey Services of WELL 4T FLOW LINE CONSTRUCTION (BATAN FIELD) |
MAR 1999 |
BATAN |
SPDC/DAEWOO |
SATISFACTORY |
87 |
As-Built Survey Services of WELL 13T (AHBR-1) FLOW LINE CONSTRUCTION (BATAN FIELD) |
MAR 1999 |
BATAN
|
SPDC/DAEWOO |
SATISFACTORY |
87 |
As-Built Survey Services of WELL 12T (AJBR-2) FLOW LINE CONSTRUCTION (BATAN FIELD) |
SEP 1998 |
BATAN
|
SPDC/DAEWOO |
SATISFACTORY |
88 |
As-Built Survey Services of WELL 50T FLOW LINE REPLACEMENT/RE-ROUTING TO ODIDI 1 FLOW STATION (ODIDI-1 FIELD) |
MAR 1998 |
ODIDI-1 |
SPDC/DAEWOO |
SATISFACTORY |
89 |
As-Built Survey Services of BATAN/AJUJU PROJECT CONSTRUCTION |
DEC 1997-JUN 1998 |
BATAN/AJUJU |
SPDC/DAEWOO |
SATISFACTORY |
90 |
As-Built Survey Services of DIBI PROJECTS (SFS) CONSTRUCTION |
MAR 1998-JUN 1998 |
BENIN-RIVER |
CNL/DAEWOO |
SATISFACTORY |
91 |
As-Built Survey Services of BATAN FLOW LINES CONSTRUCTION |
MAR 1998-APR 1998 |
BATAN |
SPDC/DAEWOO |
SATISFACTORY |
92 |
As-Built Survey Services of FLOW LINES (52) RE-ROUTING AT ODIDI-1 FLOWSTATION |
MAY 1998-AUG 1999 |
ODIDI-1 |
SPDC/DAEWOO |
SATISFACTORY |
93 |
P1 And FP Survey of OJOBO SAND-FILL AREA (Topographic & Hydrographic Analysis) |
NOV 1997-FEB 1998 |
OJOBO |
SPDC/ZENITH |
SATISFACTORY |
94 |
As-Built Survey Services of AJUJU FLOW LINES CONSTRUCTION |
DEC 1997-FEB 1998 |
AJUJU |
SPDC/DAEWOO |
SATISFACTORY |
95 |
As-Built Survey Services of OLERO CREEK (NFS&QUS) CONSTRUCTION |
OCT 1997- APR 1998 |
OLERO CREEK |
CNL/DAEWOO |
SATISFACTORY |
96 |
As-Built Survey Services of SAND PAD ONSTRUCTION/CONCRETE BARGE INSTALLATION, VENT, EMERGENCY RELEIF, FLARE LINES, TRANSLATIONAL RESTRAINING AND BUMPER PILES. |
OCT 1997- APR 1998 |
BENIN -RIVER & DIBI |
CNL/DAEWOO |
SATISFACTORY |
97 |
As-Built Survey Services of TUNU EPF PROJECTS
|
OCT 1996-NOV 1996 |
TUNU |
SPDC/DAEWOO |
SATISFACTORY |
98 |
Spot Levelling And Mapping Survey Of Parcel (A) Contract of the PROPOSED AIRPORT, OSUBI, WARRI |
FEB 1996 |
WARRI |
SPDC/ESJAY |
SATISFACTORY |
99 |
As-Built Survey Services of ABITEYE FLOW LINES CONSTRUCTION |
JUN 1996-OCT 1996 |
ABITEYE |
CNL/DAEWOO |
|
100 |
As-Built Survey Services of MAKARABA FLOW LINE CONSTRUCTION |
MAR 1996-MAY 1996 |
MAKARABA |
CNL/DAEWOO |
SATISFACTORY |
101 |
As-Built Survey Services of BENIN- RIVER FLOW STATION CONSTRUCTION |
NOV 1995-MAR 1996 |
OLERO CREEK |
CNL/DAEWOO
|
SATISFACTORY |
102 |
As-Built Survey Services of Sand Pad, Vent, Emergency Relief, Flare Lines, Translational Restraining And Bumper Piles |
OCT 1995/96 |
OLERO CREEK |
CNL/DAEWOO |
SATISFACTORY |
103 |
Investigation Survey Of Abraka-Ashaka Road |
JUNE 1994 |
ABRAKA |
OMPADEC (NDDC) |
SATISFACTORY |